White River Hydroelectric
Power Project

Precision Controlled Blasting at Batesville, Arkansas Lock #3 Rock Excavation inside the lock
Lock #3 Underwater Concrete Demolition
Lock #3 Downstream Underwater Rock Excavation
For: Mobley Contractors, Inc.
Back to the White River main page.  

Lock #2 Concrete Demolition

At location 2 near Desha, Arkansas the existing concrete gate and entrance sills had to be removed in order to let sufficient water into the powerhouse.  These were left in place during the powerhouse construction in order to keep the lock stable until construction was complete.  The sills were drilled and blasted after the powerhouse was complete.  The newly constructed powerhouse was only about 50 feet from the front of the concrete gate sill. 

The concrete was poured with the existing walls of the lock during construction and had to be blasted without damaging any of the concrete to remain.  At lock #1 this was all done underwater.


Safety & Ethics | ContactProjects | Work History | Links | Quick Reference
FAQ's | Site Map | Video Clips | Home

***  Rock Blasting Services  ***
Quarry Shot Service
| Rock Blasting | Contract Drilling
Road Cuts | Utility Blasting | Sitework
Precision Controlled Rock Blasting


Site Created and Maintained by Dykon Blasting Corp.
For use with Internet Explorer 6 or later.
© 1999-2007 Dykon Blasting Corp.
Email WebMaster