White River Hydroelectric
Power Project

Photo Albums

Return to White River Main Project Page

Lock #2 Concrete Demolition

At location 2 near Desha, Arkansas the existing concrete gate and entrance sills had to be removed in order to let sufficient water into the powerhouse.  These were left in place during the powerhouse construction in order to keep the lock stable until construction was complete.  The sills were drilled and blasted after the powerhouse was complete.  The newly constructed powerhouse was only about 50 feet from the front of the concrete gate sill. 

The concrete was poured with the existing walls of the lock during construction and had to be blasted without damaging any of the concrete to remain.  At lock #1 this was all done underwater.

Movie Clip     Full Sized  (28 megs)
Movie Clip    Small Size  ( 9 megs)

Online Photo Albums

Lock #3 Rock Excavation inside the lock
Lock #2 Concrete Demolition
Lock #3 Underwater Concrete Demolition
Lock #3 Downstream Underwater Rock Excavation

 

Relevant Links

Letter of Recommendation
from Mobley Contractors


Safety & Ethics | Contact Projects | Work History | Links | Quick Reference
FAQ's | Site Map | Video Clips | Home

***  Rock Blasting Services  ***
Quarry Shot Service
| Rock Blasting | Contract Drilling
Road Cuts | Utility Blasting | Sitework
Precision Controlled Rock Blasting


Site Created and Maintained by Dykon Blasting Corp.
For use with Internet Explorer 6 or later.
© 1999-2007 Dykon Blasting Corp.
Email WebMaster

 

 

A Precision Drilling and Blasting Contractor