A Precision Drilling and Blasting Company        

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

 
 
 
 


 Precision Drilling & Blasting

Dykon Blasting
Kissimmee River Restoration
Reinforced Concrete Explosive Demolition

 
Return to the Kissimmee Page

The upper section of the Spillway had to be removed before the bottom of the structure could be prepared for demolition.  The service road had to remain so that we could use it for access to the structure for the second blast.

The Spillway gate upper structure before the blast.

The Spillway Gate upper structure during the blast.

The Spillway Gate upper structure after the blast. The service road is still intact.

 
Click here to download a video clip of the upper structure blast.  Windows Media player or Real Player will open the video file.

Return to the Kissimmee Page



Safety & Ethics | Contact Projects | Work History | Links | Quick Reference
FAQ's | Site Map | Video Clips | Home

***  Rock Blasting Services  ***
Quarry Shot Service
| Rock Blasting | Contract Drilling
Road Cuts | Utility Blasting | Sitework
Precision Controlled Rock Blasting


Site Created and Maintained by Dykon Blasting Corp.
For use with Internet Explorer 6 or later.
© 1999-2007 Dykon Blasting Corp.
Email WebMaster

A Precision Drilling and Blasting Contractor