|
The active utility lines are hanging in the edges of the trench. The darker grey material in the edges of the trench is the rock walls left after the blasting. The brown material on top is dirt. |
|
Safety & Ethics |
Contact |
Projects |
Work History |
Links |
Quick Reference *** Rock
Blasting Services ***
|